Gallery

Our Work

PE “ TRANSNAFTA”, Zmaj Jovina 1, 13000 Pančevo

Mechanical and assembly works on damage and insulation reparation on oil pipeline based on intelligent pigs scanning results, section DN-1

PE “ TRANSNAFTA”, Zmaj Jovina 1, 13000 Pančevo

Urgent intervention on pipeline reparation on section DN-2

PE MB "Kolubara" - branch "Prerada" - Vreoci

Assembly works and dismantling pipeline for chemical treatment of boiler K1 and K2, 50MW

PE EPS, PP “Nikola Tesla”, PP “Morava”

Works on inlet and outletsuperheater collectors

PE EPS, PP “Nikola Tesla” B, Obrenovac

Adaptation of slag transport system under silo

PE EPS, PP “Nikola Tesla” B, Obrenovac

Works on hanging pipes for Reheater 2

Babcock Borsig Steinmüller, PP „Bitola“ Block 3

Works on high pressure equipment: superheater from material 13CrMo4-5, 10CrMo9-10, X10CrMoVNb9-1, and collector evaporator - 16Mo3, capacity of steam boiler 210MWe

PE EPCG PP „Pljevlja“

Works on high pressure equipment: superheater from material 13CrMo4-5, 10CrMo9-10, X10CrMoVNb9-1, and collector evaporator - 16Mo3, capacity of steam boiler 210MWe

PCE “Beogradske elektrane”, HP Novi Beograd

Dismantling and assembly works on upper eco package VK2