SERBIA

Serbia

PE “ TRANSNAFTA”, ZmajJovina 1, 13000 Pančevo

- Mechanical and assembly works on damage and insulation reparation on oil pipeline based on intelligent pigs scanning results, section DN-1….gallery

- Urgent intervention on pipeline reparation on section DN-2….gallery

- Mechanical, assembly and construction works on damage and insulation reparation on oil pipeline based on intelligent pigs scanning results, section DN-2 ....galery

“VIA OCEL”, Tadeuša Košćuška 56, Belgrade

PE MB "Kolubara" - branch "Prerada" - Vreoci

- Assembly works and dismantling pipeline for chemical treatment of boiler K1 and K2, 50MW….gallery

PE EPS, PP “Nikola Tesla”, PP “Morava”

- Works on inlet and outletsuperheater collectors…..gallery

PE EPS, PP “Nikola Tesla” A, Obrenovac

- Reparation of the mill circuit

PE EPS, PP “Nikola Tesla” B, Obrenovac

- Works on convective heating surface :superheater 1

PE EPS, PP “Nikola Tesla” B, Obrenovac

- Adaptation of slag transport system under silo….gallery

PE EPS, PP “Nikola Tesla” B, Obrenovac

- Works on hanging pipes for Reheater 2 ….gallery

PE EPS, PP “Kostolac” A, Kostolac

- Dismantling and assembly works on eco-1 in the boiler A2 ….gallery

PCE “Beogradskeelektrane”, HPKonjarnik

- Reconstruction of main heating system for hot water

Babcock Borsig Steinmüller, PP „Bitola“ Block 3

- Works on high pressure equipment: superheater from material 13CrMo4-5, 10CrMo9-10, X10CrMoVNb9-1, and collector evaporator - 16Mo3, capacity of steam boiler 210MWe….gallery

PE EPCG PP „Pljevlja“

- Works on convective heating surface: Superheater 4 from material 12H1MF on steam boiler capacity 210Mwe….gallery

PCE “Beogradske elektrane”, HP Novi Beograd

- Dismantling and assembly works on upper eco package VK2 ….gallery

- Dismantling and assembly works on lower eco package VK4 ….gallery

“SLOBODA METAL”, Obrenovac

- Works on ear heater on boiler A4- PE EPS, PP „Nikola Tesla“ A, Obrenovac

“MINEL KOTLOGRADNJA”, Uralska street no.3, Belgrade

- Prefabrication of pipeline on steam boiler facilities for PCE „Beogradskeelektrane“

“INVEST MONTAŽA” d.o.o., Nikole Spasića 3, Belgrade

- Assembly of oil fuel floor heater on HP Cerak
- Assembly of oil fuel floor heater on HP Batajnica

“INVEST-IMPORT” A.D. ,Terazije 5, Belgrade

- Locksmith and welding works on boiler construction PCE Beogradeskeelektrane, HP Novi Beograd

“KIRKA SURI” d.o.o. Miodraga Petrovića 15, Belgrade

-Welding works on pipe system for hot water boiler (ECO package and collectors)

“MESSER TEHNOGAS” A.D., Banjički put 62, Belgrade

- Linking of pipe from pipeline to filters in section CO2, factory Pancevo

“NIS” – Oil Rafinery Pančevo

- Perfabrication and assembly of bundle tubes with collector for superheater on blast furnance in faciliy FSS

AD “BEOGRAD” IMK , Žorža Klemansoa 20, Belgrade

- Assistance in sertification of DIN 18800-7 unit and training of welders – procedure 135 P BW 1.1

“NS-TERMOMONTAŽA” d.o.o. , Stevana Mokranjca 18/31, Novi Sad

- Locksmith and welding works in suggar plant “Donji Srem” Pecinci

“FEROMONT INŽENJERING” AD, Bačvanska 21/II, Belgrade

- Locksmith and welding works on boiler reparation , PE EPS, PP “Nikola Tesla” A, Obrenovac

“UTVA PROING”, Utve Zlatokrile 9, Pančevo

- Production of road tankers for technical water, V=13500l

Urgent intervention on pipeline reparation on section DN-2